History

2016

Start of CNG filling stations construction in Kingisepp, Pikalevo and Narimanov.

Carrying out start-up and commissioning works in the city of Semiluki.

Installation supervision in Yaroslavl.

Manufacturing localization:

  • Dispensers;
  • Gas storage;
  • Two types of inlet valve groups with gas meter unit:
    • Internal;
    • External.
2015

Participation in startup and commissioning works in Ufa, Nizhnekamsk.

Resolution to implement the project of constructing the CNG filling station in Kamensk-Shakhtinsky (Rostov Region) and Gorelovo (Leningrad Region).

2014

Supply of CNG filling stations equipment.

Resolution to build a CNG filling station (St. Petersburg, Korabelnaya ulitsa).

Development of gas driven Goeppel Bus G04City 12 CNG.

2013

Signing Memorandum with “Gazprom JSC” “Cooperation in the area of natural gas use as motor fuel”, foundation of a subsidiary of „Kirovsky Zavod“ JSC, “Kirovsky Zavod Gas Technologies” LLC

2003

Start of series assembly of “Neva-16” gas compressor unit.

The unit was installed in the city of Rzhev in Tver Region and has a highly efficient cycle air system: 40 meters high outlet pipe, ball fittings for gas systems, heating systems with high-temperature fittings, anti-freeze system with controlled warm air supply depending on the weather conditions.

1993-
2001 

The highlight of 1992 was signing the Memorandum of cooperation in developing of high-performance technological equipment for natural gas production and transportation by Viktor Chernomyrdin, the president of Gazprom and Petr Semenenko, the CEO of Kirovsky Zavod.

Taking into account the promising outlook for CNG-filling stations, Kirovsky Zavod design engineers have based the gas treatment technology on the original ideas distinct from the similar ones. Atmospheric emissions were minimized; a pollution-free equipment was developed. Most of the processes, such as starting and shutting down the compressor, dryer’s mode switching were computerized, which allowed servicing the station by one operator only;  100% gas compression, drying and purifying processes control, as well as gas metering and measuring control was introduced, which enhanced the reliability of all systems of the station. 

1992

Signing the Memorandum with Gazprom.

The highlight of 1992 was signing the Memorandum of cooperation in developing of high-performance technological equipment for natural gas production and transportation by Viktor Chernomyrdin, the president of Gazprom and Petr Semenenko, the CEO of Kirovsky Zavod.